| Sign In | Join Free | My lightneasy.org |
|
Model Number : HGY
Certification : CE
Place of Origin : China
MOQ : 1 set
Price : HGY 15--35
Payment Terms : L/C,T/T
Delivery Time : 5-8 days
Climbing device
| Model | Units | HGY29C | ||
| Performance | Max.radius of placing boom | m | 28.9 | |
| Freestanding height (to the joint between the end of the boom and swivel table) () | m | 22.7 | ||
| Boom articulation | ° | 400 | ||
| Slewing brake | / | always close | ||
| Working temperature | ºC | 0ºC~60ºC | ||
| Total weight | kg | 19100 | ||
| Counter weight | kg | Have no | ||
| Power | / | 380V/50HZ | ||
| Motor | Model | / | Y2-160M-4 | |
| Power | kW | 11 | ||
| Hydraulic system | Pressure | MPa | 30 | |
| Flux | l/min | 18 | ||
| Hydraulic oil | Circumstance temperature35ºC-50ºC35ºC-50ºC | / | L-HM 68 | |
| Circumstance temperature5ºC-35ºC5ºC-35ºC | / | L-HM 46 | ||
| Circumstance temperature -15ºC-5ºC-15ºC-5ºC | / | L-HM 32 | ||
| Control mode | / | Short-haul Control /radio remote control/ | ||
| Pipeline cleaning | / | Wet cleaning/Dry cleaning / | ||
| Structure of tower body | / | Tubular column | ||
| Section of tower body | m×m | 0.75×0.75 | ||
| Boom | Shape | / | Three hydraulic foldable arms R | |
| Inner diameter of pipeline | mm | DN125 | ||
| End hose | ″×mm | 5″×3000 | ||
| 1st section | Length | m | 11.5 | |
| Articulation | ° | 0°~82.5° | ||
| 2nd section | Length | m | 9.3 | |
| Articulation | ° | 0°~180° | ||
| 3rd section | Length | m | 8.1 | |
| Articulation | ° | 0°~180° | ||
| Climbing | Climbing mode | / | By hydraulic cylinder climbing | |
| Interval of climbing | m | 0.52 | ||
| Floor frame | / | Hole prepared in floor | ||
| Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
| Min.Interval of climbing frame | Climbing | m | 3.0 | |
| Placing concrete | m | 6.0 | ||
| Rest | m | 6.0 | ||
| Model | Units | HGY33E | ||
| Performance | Max.radius of placing boom | m | 33 | |
| Freestanding height (to the joint between the end of the boom and swivel table) () | m | 22.7 | ||
| Boom articulation | ° | 400 | ||
| Slewing brake | / | always close | ||
| Working temperature | ºC | 0ºC~60ºC | ||
| Total weight | kg | 21200 | ||
| Counter weight | kg | Have no | ||
| Power | / | 380V/50HZ | ||
| Motor | Model | / | Y2-160L-4 | |
| Power | kW | 15 | ||
| Hydraulic system | Pressure | MPa | 30 | |
| Flux | l/min | 18 | ||
| Hydraulic oil | Circumstance temperature35ºC-50ºC35ºC-50ºC | / | L-HM 68 | |
| Circumstance temperature5ºC-35ºC5ºC-35ºC | / | L-HM 46 | ||
| Circumstance temperature -15ºC-5ºC-15ºC-5ºC | / | L-HM 32 | ||
| Control mode | / | Short-haul Control /radio remote control/ | ||
| Pipeline cleaning | / | Wet cleaning/Dry cleaning / | ||
| Structure of tower body | / | Tubular column | ||
| Section of tower body | m×m | 0.75×0.75 | ||
| Boom | Shape | / | Three hydraulic foldable arms R | |
| Inner diameter of pipeline | ||||
| m | 12.38 | |||
| Articulation | ° | 0°~82.5° | ||
| 2nd section | Length | m | 10.93 | |
| Articulation | ° | 0°~180° | ||
| 3rd section | Length | m | 9.69 | |
| Articulation | ° | 0°~180° | ||
| Climbing | Climbing mode | By hydraulic cylinder climbing | ||
| Interval of climbing | m | 0.52 | ||
| Floor frame | / | Hole prepared in floor | ||
| Shaft frame | m | Hole prepared in floor 2.0~2.7 | ||
| Min.Interval of climbing frame | Climbing | m | 3.0 | |
| Placing concrete | m | 6.0 | ||
| Rest | m | 6.0 | ||



|
|
Concrete place boom Images |